Categories: SIMAHPP, SIMAHPP Lite, SIMAHPP Net, SIMAHPP Pro, SIMAHPP Standard

International sales agents wanted - HydroXpert Technology

With HydroXpert's plan to expand its international customer base, we are looking for sales agents and distributors for our products to reach new customers in USA, Canada, Australia, Europe, and Asia. more »
Permalink

SIMAHPP v4.8 with variable turbine efficiency for hydro power project feasibility studies

10/18/11 | by admin [mail] | Categories: SIMAHPP, SIMAHPP Pro
SIMAHPP 4.8 now integrates variable turbine efficiency editor, with which users can enter desired turbine efficiency for each flow. Modified values can be saved and automatically accessed by the program as another simulation run is executed. more »
Permalink

Special summer time offer on SIMAHPP Lite & SIMAHPP Standard

06/16/11 | by admin [mail] | Categories: SIMAHPP, SIMAHPP Standard, SIMAHPP Lite
We are offering special summer time discount on SIMAHPP Lite and SIMAHPP Standard, 30% off for orders made until 8th July 2011. These products are available for instant download from our online secured store at https://hydroxpert.com/store/ more »
Permalink

Special offers on SIMAHPP software

04/22/11 | by admin [mail] | Categories: SIMAHPP, General
Hydroxpert Newsletter1. Online Shopping StoreOnline shopping Store is now available at https://hydroxpert.com/store,which can also be accessed directly from the main page, 'Store' menu.2. Special offersTill 30th April, special offers are on all of the SI… more »
Permalink

SIMAHPP 4.5 release notice with a new module for sensitivity analysis

09/04/10 | by admin [mail] | Categories: SIMAHPP, SIMAHPP Pro
SIMAHPP 4.5 Professional offers much flexible simulation options and integrates a new module to conduct sensitivity analysis. SIMAHPP is Windows based decision tool used to simulate and assess the feasibility of hydropower projects. It is a multi-site, multi-option simulator intended to solve a wide range of problems such as determining design flow to chose appropriate hydro turbine, optimized time of operation in a year so as to maximize the hydropower and thus increasing the annual energy production, determine the energy revenue, estimate investment and related costs, determine amortization rates, Net Present Value (NPV), Internal Rate of Return (IRR), payback periods, and indicates the quantity of carbon emission reduction potential if the planned hydropower project is to be operational. more »
Permalink

Pages: 1 2 >>

Hydroxpert products, technologies in water, environment, and renewable energy.

Search

XML Feeds

powered by b2evolution